Customization: | Available |
---|---|
After-sales Service: | Online Support, Free Spare Parts |
Sample Type: | Solidity |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Thawing time limit tester
SMTP-4B thawing time limit tester is used to inspect the condition of thawing, softening or dissolution of solid preparations such as suppositories or vaginal tablets under the prescribed conditions. It's a mechatronic product which is designed and produced in accordance with the requirements of Chinese Pharmacopoeia (Edition 2015) on "suppository thawing time limit inspection methods".
Main features
P1:run for 30min, the metal racks turn over once automatically every 10 minutes
P2:run for 60min, the metal racks turn over once automatically every 10 minutes
P3:run for 30min, the metal racks don't turn over.
Number of sleeve racks | 3 sets |
Size of transparent sleeve | height 60mm; inner diameter 52mm |
stainless steel net rack | 2 sheets, diameter of 50mm, with 39 holes of 4mm. |
Timing range | (10~900)min |
Timing precision | ±0.5min |
Temperature control range | (20~45)ºC |
Temperature control precision | ±0.5ºC |
Volume of beaker | 5L(3PCS) |
Power supply | 220V/50Hz/1000W |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.