Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts; Online Support |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Infitek DO-B600N Dissolved Oxygen Meters
Description
It is widely used in accurate laboratory analysis, especially for the inspection and monitoring of environmental monitoring stations.
Advantages
Model | DO-B600N |
Percentage saturation measurement range | 0.0%~400.0% |
Resolution | 0.1% |
Precision | ± 0.5% F.S. |
Oxygen concentration range | 0.00mg/L~40.00mg/L |
Resolution | 0.01mg / L |
Precision | ± 0.5% F.S. |
Temperature range | 10.0ºC ~110.0ºC |
Resolution | 0.1ºC |
Precision | ± 0.2ºC |
Scope of atmospheric pressure compensation | 600~1400 mbar |
Set the score | 1 mbar |
Default value | 1,013 mbar |
Scope of salinity compensation | 0.0 g / L~40.0 g / L |
Set the score | 0.1 g / L |
Default value | 0.0 g / L |
Use environment | 5ºC ~60ºC, the relative humidity is <90% |
Electricity | # 7 (AAA) battery * 2; or 220V power adapter |
Dimensions(W * L * H) | 150 * 200 * 60mm |
Weight | 660 g |
Q: How about quality of the goods?
A:lAll the running products comply with CE standards.
lIndependent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
lWell-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:lTimely reply to pre-sales enquiries
lReal-time update of manufacturing and shipment status
lContracted third-party maintenance company in over 60 countries
lAssured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.