Customization: | Available |
---|---|
Usage: | Chemical Industry |
Motive Force: | Electric power |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Type | LWP-G3 | |||
Model | LWP-G3-10 | LWP-G3-20 | LWP-G3-30 | LWP-G3-40 |
Influent Requirement | Urban tap water: TDS<200ppm,5-45°ºC,1.0-4.0Kgf/cm³(if influent TDS>200ppm, external softener is recommended) | |||
System Process*t | PF+PP+RO+DI | |||
Indexes of DI Water | ||||
Resistivity | 16-18.2MΩ.cm@25ºC | |||
Heavy Metal lon | <0.1ppb | |||
PM (>0.2um) | <1/ml | |||
RO Indexes | ||||
lon Rejection Rate | 96%-99% (when new RO film is used) | |||
Organic Rejection Rate | >99% (when MV>200 Dalton) | |||
PM and Bacteria Rejection Rate | >99% | |||
Water Yield (25°C) | 10L/H | 20L/H | 30L/H | 40L/H |
Instantaneous Water Yield | 1.5-2.0L/min (pressure barrel is needed) | |||
Water Outlet | 2PCS.: RO water,Dl water | |||
Size/Weight(W*D*H) | 410×490×510mm/ about 25Kg | |||
Package Dimension/G.W.(W*D*H) | 760*660*1070mm/67kg | 750*650*820mm/57kg | ||
Power Supply/Power/Noise | 220V50HZ/50-80W/<50db | |||
Standard Configuration | Host (including 1 set of purified column)+Built-in 12L pressure barrel+ accessory bag |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.