Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts; Online Support |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
•The whole is made of high-quality stainless steel.
•Using the high-temperature steam provided by the boiler for heating and saving energy.
•Using the condensed water of boiler steam as source water.
•Plate steam heating tube with high thermal efficiency.
•The tube-and-tube cooling device has a large water output and is easy to maintain.
•During the distillation process, it can effectively achieve filtration, ammonia removal, and water vapor separation to ensure the quality of the distilled water produced.
Model | Water output | Steam pressure | Cooling water pressure | Steam consumption | Water consumption ratio | Overall dimensionW*D*H(cm) | Package Dimension W*D*H(cm) | G.W.(kg) |
WDST-T50 | ≥50L/h | 0.4MPa | 0.2MPa | ≈1:1 | ≤1:14 | 77×67×145 | ||
WDST-T100 | ≥100L/h | 77×72×165 | ||||||
WDST-T200 | ≥200L/h | 93×87×140 | 1040*780*1430 | |||||
WDST-T400 | ≥400L/h | 113×103×165 | 131*94*162 | 200 | ||||
WDST-T600 | ≥600L/h | Temporarily undecided |
Q: How about quality of the goods?
A:
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.