Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Laboratory Professional Dry Bath Incubator Equipment
1. Excellent temperature control accuracy and uniformity to protect samples and ensure precision result of tests.
2. Timer function and continuous function are available to meet different applications.
3. Fast heating rate to improve the efficient workflow.
4. Especially suitable for sample preparation of semiautomatic biochemistry analyzer.
5. 5ml and 10ml mixed heating block.
6. Overheating protection.
Specifications | DBI-60 |
Heating temperature range | 5 gears: 25ºC, 30ºC, 37ºC, 45ºC, 60ºC |
Temperature accuracy | ±0.5ºC |
Temperature uniformity | ±0.3ºC |
Max. heating rate | 5.5ºC/min |
Safety temperature | 80ºC |
Time setting range | 0min-99h59min |
Operation type | Continuous/timer operation |
Capacity | 30×5mL+8×15mL |
Display | LED |
Voltage (VAC) | 200~240 |
Frequency (Hz) | 50/60 |
Power (W) | 160 |
Dimensions (W×D×H) | 175mm×290mm×85mm |
N.W. / G.W. | 2.5kg / 4.5 kg |
Package Dimension (W*D*H) | 500*370*300mm |
Block types | Capacity | Diameter Depth |
28×5/10mL | Φ13mm/15.25mm 33mm |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.