Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts; Online Technical Support |
Application: | School, Hospital, Lab |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
*Low energy consumption and low noise.
*A d j u s t a b l e s p e e d , Suitable for use in freezer rooms.
*LCD display, simple and convenience.
*The time controller can alarm automatically
*Replaceable trays for different containers.
Type |
SHK-O0310II |
SHK-O0220 |
Speed |
50-300rpm |
50-250rpm |
Orbit Diameter |
10mm |
20mm |
Timing |
1min-99h59m |
|
Weight |
3kg |
2.5kg |
Ambient Temperature |
4-45°C |
|
Dimension(W×DXH)(mm) |
284x264x90mm |
|
Voltage |
AC100-230V |
Type |
Picture |
Contents |
P1 |
|
Single stainless steel tray |
P2 |
|
Double stainless steel tray |
P3 |
|
Aluminum alloy tray with 6 250ml |
P4 |
|
Aluminum alloy tray with 12 100ml |
P5 |
|
Stainless steel tray with adjustable |
P6 |
|
Universal tray |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.