Customization: | Available |
---|---|
After-sales Service: | Online Support, Free Spare Parts |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Microcomputer control, DC brushless motor, stable operation, low noise, high speed accuracy.
2. Touching panel, programmable operation. The operation parameters can be set according to demands and stored automatically 3. LED or LCD display, user-friendly interface, simple and convenient operations.
4. The real-time conversation of Speed and RCF is convenient for operation.
5. It has self-locking device, over-speed safety device, over-temperature safety device, imbalance safety device and automatic alarm device.
6. It has 9 files of acceleration and deceleration for your choice.
Model | CFGR-B20B |
Max speed | 20000r/min |
Max RCF | 27800×g |
Max capacity | 100ml×4 |
Speed accuracy | ± 30r/min |
Time setting | 1min~99h 59min /1min~99min |
Temperature setting | -20 ~ +40 ºC |
Temperature accuracy | ±1 ºC |
Compressor unit | R404A |
Noise | <65dB(A) |
Power supply | AC110V/60Hz AC220V/50Hz |
Dimension(L*W*H) | 600mm×470mm×330mm |
Packing size(L*W*H) | 720mm×610mm×430mm |
Net weight | 50kg |
Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.