Customization: | Available |
---|---|
After-sales Service: | Online Support and Free Spare Parts |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model |
FNC-BX1200-2.5E | FNC-BX1200-5E | FNC-BX1200-8E | FNC-BX1200-10E | ||||
Heating mode | Alloy wire heating in three sides left; right; top side. | |||||||
Temperature | Max. Temp(ºC) | 1200 | ||||||
Accuracy(ºC) | ±1 | |||||||
Heating Rate | ≤30min | |||||||
Chamber Dimension(W*D*H)(mm) | 120*200*80 | 200*300*120 | 200*300*200 | 250*400*160 | ||||
External Size(W*D*H)(mm) | 450*685*600 | 530*785*640 | 530*785*720 | 600*895*700 | ||||
Capacity(L) | 2 | 7 | 12 | 16 | ||||
Heating Element | Alloy heating wire | |||||||
Thermocouple | E :Platinum-rhodium sensor;Without E :K type | |||||||
Chamber Material | Ceramic fiber | |||||||
Outer shell | cold rolling steel electrostatic spraying exterior | |||||||
Temp. control mode | E Type : domestic Xianmen Yudian single-stage temperature controller Without E Type:Japaness conduction single-stage temperature controller |
|||||||
Electricity | AC220V/6.6A 50/60HZ |
AC220V/13.6A 50/60HZ |
AC220V/20.4A 50/60HZ |
AC380V/9.9A 50/60HZ |
||||
Max. Consumption | 1.5kW | 3.0kW | 4.5kW | 6.0kW |
Q: How about quality of the goods?
A:lAll the running products comply with CE standards.
lIndependent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
lWell-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:lTimely reply to pre-sales enquiries
lReal-time update of manufacturing and shipment status
lContracted third-party maintenance company in over 60 countries
lAssured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.