| Customization: | Available |
|---|---|
| Theory: | Autoclave |
| Type: | Pressure Steam Sterilization Equipments |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

|
Model
|
STV-A35II | STV-A50II | STV-A75II | STV-A100II |
| Volume | 35L | 50L | 75L | 100L |
| Power | 3.5kW | 3.5kW | 4.5kW | 4.5kW |
| Voltage | AC 220/110V,50/60Hz | |||
| Design pressure | 0.25MPa | |||
| Design temperature | 139ºC | |||
| Rated working pressure | 0.22MPa | |||
| Rated working temperature | 134ºC | |||
| Sterilization temperature | 116ºC~134ºC | |||
| Sterilization time setting range | 4~120 min | |||
| Drying time setting range | 0~240min | |||
| Chamber volume(mm) | Ø300*450 | Ø350*515 | Ø400*585 | Ø450*615 |
| Bucket dimension(mm) | Ø275*395 | Ø325*235*2 | Ø375*265*2 | Ø425*275*2 |
| Basket dimension(mm)(optional) | Ø270*380 | Ø320*220*2 | Ø370*250*2 | Ø420*265*2 |
| Outer dimension(mm) | 610*430*1030 | 675*500*1100 | 716*540*1165 | 748*545*1255 |
| Package Dimension(W*D*H)(mm) | 670*520*1160 | 740*590*1230 | 790*610*1310 | 820*650*1380 |
| N.W. / G.W. (kg) | 74/90 | 97/125 | 114/145 | 129/161 |


Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.
