Customization: | Available |
---|---|
Type: | Coagulation Analyzer |
Certification: | FDA |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
It adopts coagulation method, immunoturbidimetric method and chromogenic substrate method, and can test all coagulation related test items such as conventional four items, D-D, FDP, AT, etc
Advantages
Model | BCA-A-4-20 |
Test Speed(Ts/h) | 200 |
Probe | 1 |
Test Method | Coagulation(magnetic beads), Immunoturbidimetry,chromogenic substrate |
Test Items | PT(INR) , APTT, FIB, TT, D-dimer, FDP, AT-III, all Factors, FM, APC-R, PC, PS, vWF, HEP, LMWH, AT, PLG, PAI, TAFI, Free-Ps, AP, HNF/UFH |
Test Channels | 4 |
Sample Position | 35 |
Pre-heating Channels | 20 |
Reagents Position | 21(20+1) |
Sampling Arm | 1 |
Washing Position | 1 |
Cuvettes Loading System | Drawer style |
Reagent Loading System | Drawer style |
Sample Loading System | Drawer style |
Magnetic Cuvettes Loading | 1000 |
Auto Positioning | Yes |
Integrated Sampling Pump System | Yes |
Inner Card Reading Function | Yes |
Bar Code Recognition Function | Yes |
LED Lighting | Yes |
Four Direction Cooling | Yes |
Insufficient Alarm for Cuvettes, Reagents,Detergent | Yes |
LIS System | Yes |
Weight | 110Kg |
Dimension | 60*62*65cm |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.