Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts; Online Support |
Warranty: | 3 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | MSC-B208(Siedentopf) |
Optics | Finite Distance Optical System / *Infinity Optical System |
Observation Tube | Tilting binocular,interpupillary 55-75mm |
Viewing Head | Siedentopf head,inclined at 30° |
Optical Coating | Transmittance ≥ 95% |
Eyepieces | Wide field eyepiece WF10×18mm |
*Wide field eyepiece WF10×20mm | |
Objective | Achromatic objective 4X, 10X, *20X,40X, 100X |
*Plan achromatic objective: 4X, 10X, 20X, 40X, 100X | |
*Plan phase objective: Ph10X, 20X, 40X, 100X | |
*Infinite plan achromatic objective: 4X, 10X, 20X, 40X,100X | |
Nosepiece | Quadruple nosepiece / *Quintuple nosepiece |
Stage | Double layers mechanical stage 140×135mm / 75×50mm (*Heating module) |
Condenser | Abbe NA1.25 with iris diaphragm & filter |
Focusing | Coaxial coarse and fine adjustment, fine division 0.002mm, coarse stroke 37.7mm per rotation, fine stroke 0.2mm per rotation, moving range 22mm |
Illumination | 3W LED Illumination, brightness adjustable |
*6V 20W Halogen lamp, brightness adjustable | |
Electricity | 100-240V AC,50/60Hz |
Package Dimension (W*D*H) (mm) | 370*260*490 |
Gross Weight (Kg) | 6.5 |
*Optional | Turret phase contrast kit, dark field attachment, fluorescent attachment, 360° rotatable viewing head |
MSC-B208T: Microscope camera (Standard imaging software) / Win 10 Pad / Digital display | |
*Optional Configuration | *Optional Configuration |
Q: How about quality of the goods?
A:
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.