Customization: | Available |
---|---|
After-sales Service: | Online Technical Support & Free Spare Parts |
Warranty: | 2 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Infitek Medical Lab Food Positive-negative pressure dual purpose Chemical Diaphragm Vacuum Pump VACP-D52/D102
Application:
Vacuum filtration, Vacuum distillation, Vacuum adsorption, Solvent filtration, Solid phase extraction, Degassing, Used for compression and air conversion gas
Model | VACP-D52 | VACP-D102 |
Pumping Speed (L/Min) | 30 | 60 |
Ultimate Vacuum | 50mbar | 200mbar |
Voltage | 220Vac,50Hz | 220Vac,50Hz |
Power | 160W | 160W |
Positive Pressure | ≥30Psi | |
Air Inlet (mm) | φ6 | φ6 |
Air Outlet (mm) | Muffler | φ6 |
Operating Ambient Temperature(°C) | 7-40 | 7-40 |
Pump Head | 2 | 2 |
Pump body Temperature(°C) | <55 | <55 |
Dimension(L×W×H) (mm) | 350x130x220 | 310x200x210 |
Weight(Kg) | 10 | 10 |
Diaphragm | Imported Rubber | Imported Rubber |
Valve Plate | Imported Rubber | Imported Rubber |
Noise(BD) | <60 | <60 |
Note | Positive-negative pressure dual purpose |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.