Customization: | Available |
---|---|
After-sales Service: | Online Support and Free Spare Parts |
Warranty: | 2 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
•Digital temperature control with max. temperature up to 280°C.
•Digital speed control with max. speed up to 1500rpm.
•Stainless steel work plate with ceramic coating provides good chemical resistant performance.
•External temperature control is possible by connecting the temperature sensor (PT1000) with an accuracy at ±0.5°C.
•LED display shows temperature and speed.
•The "HOT" warning will flash when the work plate temperature is above 50°C even if the hotplate is turned off.
Specifications | HPS-280 |
Work plate Dimension | φ135mm (5 inch) |
Work plate material | Stainless steel cover with ceramic |
Motor type | Brushless DC motor |
Stirring positions | 1 |
Max. stirring quantity | 3L |
Max. magnetic bar[length] | 50mm |
Speed range | 200-1500rpm |
Speed display | LED |
Temperature display | LED |
Speed display resolution | ±1rpm |
Heating temperature range | Room temp.-280, increment 1°C |
Control accuracy of work plate | ±1°C(<100°C) ±1%(>100°C) |
Overheating protection | 320°C |
Temperature display accuracy | ±1°C |
External temperature sensor | PT1000 (accuracy ±0.5°C) |
"Hot" warning | 50°C |
Protection class | IP21 |
Motor rating input | 5W |
Motor rating output | 3W |
Power | 515W |
Heating output | 500W |
Voltage | 100-120/200-240V 50/60Hz |
Dimension [WxDxH] | 150×260×100mm |
Weight | 1.8kg |
Permissible ambient temperature and humidity | 5-40°C, 80%RH |
LCD Digital Orbital Shaker Double layer steel Muffle Furnace
Multi-Position Hotplate Magnetic Stirrer Electrical LCD Digital Type Stirrer and Mixer
Q: How about quality of the goods?
A:
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.