Customization: | Available |
---|---|
Theory: | Autoclave |
Type: | Pressure Steam Sterilization Equipments |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | STV-30I | STV-50I | STV-75I | STV-100I | STV-120II | STV-150II |
Volume | 35L | 50L | 75L | 100L | 120L | 150L |
Power | 2.5kW | 3.5kW | 4.5kW | 4.5kW | 4.5kW | 6.0kW |
Voltage | AC 220/110V,50/60Hz | |||||
Design pressure | 0.25MPa | |||||
Design temperature | 139ºC | |||||
Rated working pressure | 0.22MPa | |||||
Rated working temperature | 134ºC | |||||
Sterilization temperature | 116ºC~134ºC | |||||
Sterilization time setting range | 4~120 min | |||||
Chamber volume(mm) | Ø300*500 | Ø350*525 | Ø400*625 | Ø450*650 | Ø450*760 | Ø500*780 |
Bucket dimension(mm) | Ø280*400 | Ø320*240*2 | Ø360*280*2 | Ø410*300*2 | / | / |
Basket dimension(mm) (optional) | / | Ø320*240*2 | Ø360*280*2 | Ø410*300*2 | Ø410*350*2 | Ø460*350*2 |
Outer dimension(mm) | 400*400*860 | 480*480*960 | 525*525*1060 | 555*555*1080 | 555*599*1200 | 605*649*1210 |
Package Dimension (W*D*H)(mm) | 570*520*1020 | 680*630*1200 | 620*680*1200 | 660*700*1240 | 700*670*1340 | 710*760*1400 |
G.W. (kg) | 76 | 86 | 90 | 115 | 130 | 130 |
Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.