Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts; Online Support |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
RMX-TR LCD Digital Tube Roller Features:
1. LCD displays the speed and time
2.Speed range of 10-70rpm
3.Six roller design for gentle rolling and easy to clean
4.Continuous or timer operation
RMX-TR-E Tube Roller
1. Speed range of 0-70rpm
2.Six roller design for gentle rolling and easy to clean
Model | RMX-TR | RMX-TR-E |
Amplitude | 24mm | |
Motor type | DC motor | |
Rocking motion | Rocking and rolling | |
Amplitude | 24mm | |
Max. load capacity | 4kg | |
Number of rollers | 6 | |
Roller size[length] | 280mm | |
Speed range | 10 -70rpm | 0-70rpm |
Speed display | LCD | Scale |
Timer | Yes | - |
Timer display | LCD | - |
Time setting range | 1-1199min | - |
Operation mode | Continuous/timer | Continuous |
Voltage | 100-240V,50/60Hz | |
Power | 30W | 25W |
Dimension [D×W×H] | 450×260×120mm | |
Weight | 5.1kg | 4.5kg |
Permissible ambient temperature and humidity | 5-40ºC,80%RH | |
Protection class | IP21 |
Q: How about quality of the goods?
A:lAll the running products comply with CE standards.
lIndependent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
lWell-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:lTimely reply to pre-sales enquiries
lReal-time update of manufacturing and shipment status
lContracted third-party maintenance company in over 60 countries
lAssured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.