Customization: | Available |
---|---|
Customized: | Non-Customized |
Certification: | CE, FDA |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Infitek Laboratory Three-Door pharmacy medical refrigerator vaccine refrigerator
Reliability and Key Features
Characteristic Function
Safety
Forced Air-cooling System
Ergonomic Design
Model | PR5-1500 | |
Capacity (L) | 1500 | |
Dimension (W*D*H) | Internal (mm) | 1680*595*1312 |
External (mm) | 1800*775*1965 | |
Temperature | Range (ºC) at RT. 10~32ºC | 2~8(Optional 2~10 ; 2~14) |
Sensor | NTC | |
Controller | Microprocessor | |
Cooling system | Refrigerant | R134a(CFC Free ) |
Defrost | Auto | |
Compressor (Qty) | SECOP/1 | |
Display | Digital display | |
Audible&Visible Alarm | High/Low temperature | standard |
Power failure backup system(alarm) | 8h | |
Door ajar | standard | |
Material | Internal | Stainless steel, grade 304 |
External | Stainless steel, grade 304 | |
Accessories | USB port | Optional |
Remote alarm port | standard | |
Test hole (Qty) / Diameter (mm) | Optional | |
Shelves / Drawers (Qty) | Shelves/12 | |
Sound Emission (dB) | 55 | |
Electricity | Voltage/Frequency | AC110/220V±10%, 50/60Hz |
Consumption (W) | 1065 | |
N.W./G.W. (Kg) | 245/280 | |
Shipping Dimension (W*D*H) (mm) | 1890*820*2170 |
Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.