Customization: | Available |
---|---|
After-sales Service: | Online Support,Video Technical Support |
Warranty: | 2 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | MCA110-10 | MCA110-5 | MCA110-2 | MCA110-1A |
Capacity | 110g | |||
Readability | 0.01g | 0.005g | 0.002g | 0.001g |
Operating Temp | 5ºC-35ºC | |||
Display | Backlit LCD | High Definition Backlit LCD | ||
Calibration | External Calibration | |||
Interface | RS232(Standard)/USB(Option) | |||
Pan Size | Ø90mm | |||
Packing Size | 500*460*370mm | |||
Gross Weight | 7.1kg | |||
Heating Source | Halogen Lamp-1 | Halogen Lamp-2 | ||
Temp. Sensor | PT100 | |||
Temp. Range | 40ºC-199ºC | |||
Temp. Step | 1ºC | |||
Moisture Range | 0.00%-100.00% | |||
Moisture Readability | 0.20% | 0.10% | 0.04% | 0.01% |
Dry Range | 100.00%-0.00% | |||
Dry Readability | 0.20% | 0.10% | 0.04% | 0.01% |
Temp Setting | 40ºC-199ºC By 1ºC Step | |||
Time Setting | 1-99min By 10s | |||
Number of Storage | 15 | |||
Heater | 220V ±15% 50Hz/110V±15% 60Hz/400W | |||
Balance | Input: 220V 50Hz/110V 60HZ Output: 9V | |||
Chamber Height | 22mm |
Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.