Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 2 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | RMT-SA358 |
Section Thickness Setting Range | 0 - 60μm |
0 - 1μm increment 0.25μm | |
1 - 10μm increment 1μm | |
10 - 20μm increment 2μm | |
20 - 60μm increment 5μm | |
Trimming Thickness Setting Range | 0- 900μm |
1 - 10μm increment 1μm | |
10 - 20μm increment 2μm | |
20 - 100μm increment 5μm | |
100 - 900μm increment 50μm | |
Minimum Setting of Sectioning Thickness | 0.25μm |
Total Horizontal Specimen Feed | 28mm |
Vertical Specimen Stroke | 52mm |
Movement Range of the Base of Blade Holder Base | 0-60mm (front to back) |
Movement Range of the Blade Press plate | 0-23mm |
Specimen Clamp Rotation | any angle within 360 degrees |
Specimen Orientation | XY - 8° |
Maximum Specimen Size | Standard wax block clip 39mm×40 mm(Other sizes available) |
Precision Error | ±1% |
Working Voltage | AC 220V±10% 50Hz (standard model); AC110V±10% 60Hz |
Power | 100W |
Dimensions | 580×410×305mm(W×D×H) |
Net weight | 29kg |
Q: How about quality of the goods?
A:lAll the running products comply with CE standards.
lIndependent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
lWell-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:lTimely reply to pre-sales enquiries
lReal-time update of manufacturing and shipment status
lContracted third-party maintenance company in over 60 countries
lAssured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.