Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts; Online Support |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Infitek Plant Nutrition Analyzer BPNA-4
The plant nutrient analyzer simultaneously saves three parameters (chlorophyll, nitrogen content and leaf temperature) at the same time. Plant chlorophyll, nitrogen content and leaf temperature are important basis for plant fertilization and irrigation. NIR spectroscopy can be used to detect leaf chlorophyll, nitrogen and leaf temperature non-destructively.
Advantages
Model | BPNA-4 |
Testing objects | Nitrogen, chlorophyll, leaf temperature, and leaf humidity(‐4N) |
Chlorophyll range | 0.0‐99.9SPAD |
Nitrogen range | 0.0‐99.9mg/g |
Leaf humidity | 0.0‐99.9RH% |
Leaf temperature | -10‐99.9°C |
Chlorophyll accuracy | ±1SPAD |
Nitrogen accuracy | ±5% |
Leaf humidity accuracy | ± 0.5% |
Leaf temperature accuracy | ± 0.5°C |
Testing area | 2mm*2mm |
Testing interval | less than 3sec |
Stored data capacity | 999 groups |
Electricity | 4.2V 2000mah Recharge Li‐ion battery |
Package size | 280*260*130mm |
Weight | 0.7kg |
Q: Are you a trading company or a manufacturer?
A: Based on independent manufacturing capability, we also integrate both domestic and international resources providing one-stop service for you all.
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.