Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Certification: | FDA |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Designed according to ASTM D3461-97
2.Measure concentration polymerization degree, refractoriness of amorphousbody highly polymerized compound
3.Photoelectric test, temperature program control, LCD display, high precisionand stable performance
4.Widely used to component control and quality test of tar, asphalt, paraffin,resin, fats, rosin, lubricant, Vaseline, medical ointment,
ointment, suppository, edible and grease
Parameters/Model |
MTP-DP1 |
Measuring range |
Room temperature~300ºC |
Minimum digital display |
0.1ºC |
Linear heating rates |
0.2, 0.5, 1.0, 1.5, 2.0, 3.0, 4.0, 5.0 ºC/min |
Furnace temperature |
≤200ºC±0.5ºC; >200ºC ±1ºC |
The dimension of cup |
Φ9.9mm (inside diameter), R4.6 ±0.1mm (bottom radius) |
Hole size |
Φ2.80mm (dropping-point), Φ6.35mm (softening-point), Φ5.00mm (user choose) |
Ball |
Lead ball (Φ3mm, 3.2±0.1g, according to ASTM) |
Weight (Gross) |
11kg |
Overall Dimensions |
720mm×370mm×280mm |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.