Customization: | Available |
---|---|
After-sales Service: | Online Support, Free Spare Parts |
Certification: | FDA |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Disintegration time limit tester is a drug test instrument to test the disintegration time limit of tablets, capsules and pills in accordance with Chinese Pharmacopoeia.
Main features:
1.Double-basket working position system measures disintegration time limit.
2.4 sets of baskets, which can conduct independent disintegration experiment respectively.
3. Electronic temperature sensor can display and monitor various points in water bath case and the temperature in the beaker. High-precision digital electronic sensor is adopted to ensure the high precision and high accuracy of water bath temperature without the need for calibration.
4. The instrument controls the bath temperature at 37.0ºCautomatically (prescribed by Pharmacopeia). It can also reset the preset temperature again at any time.
5.The instrument sets the lifting time of baskets to be 15min automatically, which can also be reset at any time.
6.It adopts the computer control technology which is centered on SCM to control two performance parameters including bath temperature and working time intelligently.
7.The instrument can monitor bath temperature, give over-temperature alarm and protect itself automatically.
Temperature prefabrication range |
room temperature~50ºC |
display resolution |
0.1ºC. |
Temperature control accuracy |
±0.3ºC |
Timing prefabrication range |
1min~900min |
Time control accuracy |
±0.5min |
Work noise |
<60db |
Number of lifting baskets |
4 set |
Lifting frequency of basket |
(30~32) times/min. |
Lifting distance of basket |
(55±1) mm |
Minimum spacing from screen to beaker bottom |
25mm±2mm |
Mesh size |
standard configuration 2mm, (optional for 0.425mm and 1mm bore diameters) |
Power supply |
220V50Hz |
Total power |
600W |
Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.